Alevro is transforming the delivery of complex heavy industrial projects. We’re a team united by expertise in construction and heavy lifting and shift with a proven capability to deliver.

In step
at scale

Capabilities

Construction and heavy lift reimagined by Alevro.

We provide turnkey heavy lifting and shift services backed by engineering expertise, delivered by an integrated team. Our customers benefit from this synthesis from our ability to collaborate in solving seemingly insurmountable problems.

monadelphous + fagioli

A Monadelphous
and Fagioli partnership

Alevro is a team united by expertise with a proven capability to deliver.

Monadelphous and Fagioli have more than a century of experience between them. The proven construction track-record of Monadelphous, combines with Fagioli’s world-class experience in engineering complex global heavy lifting projects to create a unique value proposition to the Australian resources market.
About Shapes

CASE STUDY
Karratha WA

Interconnector project

Engineering and execution for the transportation of a 170-tonne heat exchanger module from the Dampier Port to the Woodside-operated Pluto LNG plant using self-propelled modular trailers (SPMT). Lifted and placed inside a live gas plant with a 600 tonne super-lift crawler crane.

See more.

  • WEIGHT [TONNES]

    170

  • SPMT AXLE LINES

    40

Interconnector project

CASE STUDY
South Korea & Canada

Hebron project

Engineering, heavy lifting and assembly of the topside of the Hebron offshore platform in Canada. Five major modules and ancillary modules were lifted and assembled with a combination of SPMT, strand jacks, tower lift system, crawler cranes, elevator system and skids.

The 44,000-tonne utility process module, the largest loadout operation ever performed in the offshore industry, was executed in South Korea and transported to Canada.

See more.

  • HEAVIEST WEIGHT [TONNES]

    44,000

  • ELEVATOR SYSTEM [TONNES]

    7,200

Hebron project

CASE STUDY
Port Hedland WA

Car dumper refurbishment

To extend the life of BHP’s Car Dumper 1 and undertake vital maintenance, civils design of the crane pad, engineering, heavy lifting and transportation was executed on two cells. The cells were lifted out of the car dumper with a 600T crawler and on to SPMTs, transported to undertake maintenance, and returned via SPMT to the crawler crane and lifted back into the car dumper.

See more.

  • CELL WEIGHT [TONNES]

    191

  • CRAWLER [TONNES]

    600

Car Dumper Refurbishment

CASE STUDY
Italy

Sannazzaro Refinery

Refurbishing and expansion of one of the biggest petrochemical plants in Europe, located in the north part of Italy in one of the busiest European industrial areas. Tasked with finding a solution to modularise the construction of a prilling tower, over 60 meters high, maintaining the modules within the transport envelope limitation.

Our solution was to create a module assembly station at site, to stack one on top of the other three sections of prefabricated modules utilising, SPMT and strand jacking systems.

See more.

  • TOTAL ASSEMBLED MODULE WEIGHT [TONNES]

    2,000

  • MODULE ASSEMBLY STATION CAPACITY [TONNES]

    4,000

Wood River project

Innovation that moves industries.

Innovation moves industries

The Team

Meet our team

Alevro is led by a committee, with global acumen.

Contact

Get in touch.

Level 4
59 Albany Highway
Victoria Park, WA 6100

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.